4 x 250kW Primary Vent Fan for the Paulsens Underground Gold Mine.
Design & Engineering of MCC including electrical schematics & wiring diagrams, switchboard & switchroom layout & MCC cooling requirements.
PLC & HMI touch screen programming.
Variable Speed Drive set up and commissioning.
Instrumentation calibration & commissioning to measure mass air flow and air pressure.
On site project management & installation of all Electrical & Mechanical equipment, scheduling with site to minimise downtime during fan change over as new fans upgraded old 500kw unit.